Powell River Hydro Transmission –Transmission Site Demolition and Redevelopment
Engineering work supporting the redevelopment of a 132 kV / 120 MW transmission site, including system impact analysis and infrastructure planning.
- Transmission and distribution system impact analysis
- Site isolation and electrical infrastructure decommissioning planning
- Energy flow and load characterization studies
- Redevelopment electrical infrastructure planning
Utility-level engineering studies delivered to support redevelopment of a 132 kV / 120 MW transmission facility.



The Crofton Complex Vancouver & Creekside Estate Langley – Electrical Planning Reports and EV Ready Planning (Multi-Strata Applications)
Preparation of comprehensive Electrical Planning Reports for multiple strata developments across several municipalities.
- Electrical planning report preparation
- Load analysis and infrastructure assessment
- Coordination with Authorities Having Jurisdiction (AHJ)
- Compliance with municipal and utility requirements
Engineering reports delivered to support strata approval processes.
Silver Farm Maple Ridge– BC Hydro Service Upgrades
Engineering support for electrical service upgrades requested by contractors and property owners.
- Service upgrade analysis and planning
- Utility coordination with BC Hydro
- Electrical load evaluation
- Infrastructure upgrade design support
Service upgrade approvals achieved for projects up to approximately 3 MVA.


True North Labour Inc. & Insync Physio– Tenant Improvement Applications
Preparation and submission of electrical engineering package sets for tenant improvement applications.
- Electrical package preparation
- Load calculations and electrical design
- Permit documentation and compliance
- Coordination with municipal authorities
Permit-ready engineering packages successfully approved by municipal authorities.